Pilotage
Available 24/7, 365 days a year.
Our strategic priority is to increase and diversify port business, providing optimised and environmentally-sound services to existing and prospective customers and stakeholders.
A world-class port with decades of experience, our facilities, services, and commitments set us apart to add value to your operations.
Our transformational £420M investment in South Harbour allows us to offer unparalleled capacity to support projects of all sizes and requirements. The new facility is already attracting vessels and project activity that would have previously sailed past the city, often destined for a European port, capable of handling their requirements.
Port maximums
Length: 165m
Channel width: 70m
Port details
Albert Basin (blue): 6.0 - 9.3m depth, 2,042m quayside length
Telford Dock (yellow): 9.0m depth, 563m quayside length
Tidal Harbour (teal): 6.0 - 9.0m depth, 360m quayside length
Victoria Dock (orange): 6.0 - 9.3m depth, 1,820m quayside length
River Dee (black): 5.6 - 7.5m depth, 1,238m quayside length
Vessel with greater LOA will be considered on a case by case basis.
No air draft restriction.
Port maximums
Length: 300m
Channel width: 165m
Port details
Depth: 9.0 - 10.5m
Quayside length: 1,588m
Vessel with greater LOA will be considered on a case by case basis.
No air draft restriction.
Available 24/7, 365 days a year.
Fuel and water available. Shore power available from Q1 2025.
50,000m² of warehousing ranging from 700m² to 2,500m².
Excellent marine, road, rail, and air connectivity.
Contact the port team at Port of Aberdeen for more information.